Many HVAC manufacturers keep unit costs and bills of materials (BOM) in spreadsheets. When one part price changes, the change does not reach the unit total by itself. Someone has to find every unit and sub-assembly that uses the part and update it by hand, and the unit cost is often wrong until then.
In HVACinOne a unit's cost is a BOM tree. A unit has items with quantities, and an item can have its own BOM. Every part carries its own cost: typed in, taken from the selection calculation, from the item table or from its own BOM. Other costs such as labor, logistics and overhead sit on top, in order. Plus adds an amount. Multiplication adds a percent of the running total. There are four ways to calculate, and one of them runs the whole tree: every BOM below, lowest level first, then the top item. Items, BOM lines and costs go out to Excel and come back in with the same columns.
Take an example with sample values in euro. An air handling unit has 5 BOM lines, and its fan section has its own BOM of 3 lines. The unit BOM cost is 2257. Labor +380, logistics +150 and overhead +12 % bring the total to 3121.4. Then the EC plug fan changes from 820 to 900. One run on the unit moves the fan section from 951 to 1031, the unit BOM cost from 2257 to 2337 and the unit total from 3121.4 to 3211.0.
This helps product and cost engineers keep unit costs right when part prices change, without chasing spreadsheets.