A split unit's refrigerant charge is not fixed at the factory. The field pipes between the indoor unit and the condensing unit fill too. How much more depends on the site: the pipe length, the height and the pipe sizes. Under EU 2024/573, some F-gas obligations, such as leak checks, depend on the charge in CO₂ equivalent. So the pipe run matters.
In HVACinOne, the field piping is entered for each calculation: horizontal length, vertical distance, gas line and liquid line. It is part of the cycle, not added afterwards. The cycle is solved with the pressure drop of the field pipes. Then each pipe is filled at the density of its own state, liquid or gas, at its pressure. Horizontal and vertical metres both count, because a rise is pipe too. Each field pipe gets its own estimated charge row in the result, in kg. Bends and fittings are not part of the field pipe input.
Take a split CRAC with a condensing unit on the roof, R410A, a 1 3/8 in gas line and a 5/8 in liquid line. At 50 m with the unit 15 m above, the liquid line holds 9.47 kg and the gas line 1.85 kg. With the same CRAC, the same duty and the same pipe sizes, the field pipe charge is 0.87 kg at 5 m, 4.36 kg at 25 m and 8.72 kg at 50 m. At 50 m + 15 m up it reaches 11.31 kg, which is 10.4 kg more than at 5 m. The 15 m rise alone adds 2.6 kg.
This helps R&D, product and selection engineers compare site layouts and see the refrigerant in the field pipes before installation. The values are calculated estimates, not site measurements.